Next: Deliverables Up: Workplan Previous: Detailed workplan for

Workplan for the second year

The second mid-year meeting will be held at SICS in the second half of June 1995. It will include a meeting of the PCC and a technical meeting between all the partners. All the deliverables that are to be available at time T0+18 will be collected at the meeting. This includes UCL-2 (second draft), UTS-1 (second draft), SICS-3 (first draft) and UTS-2 (first draft) (see chapter ).

The second end-of-year meeting and the final review will be held at UTS in Sydney. The meeting and the review will be held in December 1995. All the deliverables that are to be available at time T0+24 will be collected at the meeting and delivered at the review. These include deliverables the final version of: UCL-2, UTS-1, SICS-1, SICS-3, SICS-4, UCL-3, UTS-2, INRIA-3 (see chapter ). The second workshop will be held at UTS in Sophia-Antipolis in December 1995 after the meeting and the review.


rodeo@sophia.inria.fr
Fri Feb 10 14:30:25 MET 1995